ServicenavigationHauptnavigationTrailKarteikarten


Forschungsstelle
EU FRP
Projektnummer
97.0205
Projekttitel
Large scale integration of AC PV modules into a noise barrier along a highway near Amsterdam (PV NB 220)
Projekttitel Englisch
Large scale integration of AC PV modules into a noise barrier along a highway near Amsterdam (PV NB 220)

Texte zu diesem Projekt

 DeutschFranzösischItalienischEnglisch
Schlüsselwörter
-
-
-
Anzeigen
Alternative Projektnummern
-
-
-
Anzeigen
Forschungsprogramme
-
-
-
Anzeigen
Kurzbeschreibung
-
-
-
Anzeigen
Partner und Internationale Organisationen
-
-
-
Anzeigen
Abstract
-
-
-
Anzeigen
Datenbankreferenzen
-
-
-
Anzeigen

Erfasste Texte


KategorieText
Schlüsselwörter
(Englisch)
PV noise barrier; AC-module; large scale PV integration
Alternative Projektnummern
(Englisch)
EU project number: SE/068/97/NL/DE/
Forschungsprogramme
(Englisch)
EU-programme: 4. Frame Research Programme - 5.1 Nonnuclear energies
Kurzbeschreibung
(Englisch)
See abstract
Partner und Internationale Organisationen
(Englisch)
Energie Noord West N.V., (NL), TNC Energie Consulting GmbH (D), Fraunhofer-ISE (D), Energie Onderzoek Centrum Nederland (NL)
Abstract
(Englisch)
The 220 kWp Grid Connected PV Plant along the A9 highway near Amsterdam went into operation at the end of 1998. The plant features 2160 PV modules, each with an integrated DC/AC microinverter.
All the AC-modules are fully integrated into a purpose built noise barrier over a length of 1650 meters.

The aim of this project is:
Reduction of system costs on an overall level through volume, integrated design and prefabrication.
Evaluation of technical, architectural and economical aspects.
Investigation of performance and impact on utility grid of a large number of parallel AC-modules.
This final report of the project looks at: design - planning - construction - maintenance - performance - final costs - comparison to other motorway projects.

Conclusion:
With an energy production of 148'821 kWh in 1999 and 129'642 kWh in the year 2000 the plant produced 90 % respectively 80 % of the estimated energy. With all the faults of the inverters rectified it can be estimated that in the future the plant will produce 158'000 kWh per annum.
Datenbankreferenzen
(Englisch)
Swiss Database: Euro-DB of the
State Secretariat for Education and Research
Hallwylstrasse 4
CH-3003 Berne, Switzerland
Tel. +41 31 322 74 82
Swiss Project-Number: 97.0205