Principaux résultats attendus:
Phase 2 of the project will complete the real-time groundwater monitoring and modelling in Guantao County to serve for real-time decision support in the pilot region.
Strong emphasis will be on policy influencing by use of the evidence and results gained from the project.
Strong efforts will be made in knowledge sharing and technology transfer to other places in China, as well as to South Asia (Pakistan, India) and Central Asia. The global outreach of this project will be facilitated by working with multilateral research organisations such as the International Water Management Institute and UN-organisations.
Principaux résultats antérieurs:
The project was carried-out in 2 pilot regions in Phase 1: In theHeihe river basinin northwest of Chinaa combined groundwater metering and water fee collection system was implemented through a public-private-partnership. Combined with a groundwater pricing system associated with quota and subsidy for water saving equipment, the system encourages farmers to save water and has already contributed to mitigation of groundwater over-exploitation. The Heihe pilot is completed and sustainably operated by the Chinese partners.
In the second pilot site, theGuantao County of Hebei province in the North China Plainthe project designed a system of monitoring groundwater abstraction based on electricity consumption. This cost-efficient method successfully solved the difficulty of groundwater monitoring, and can be up-scaled to the entire North China Plain. In addition, an online data platform has been set-up to store the observation data of groundwater pumping and groundwater levels, and tools for modelling and decision-making were developed in Phase 1.
|