En-tête de navigationNavigation principaleSuiviFiche


Unité de recherche
DFAE
Numéro de projet
ExSt.2017.853
Titre du projet
Strengthening Right to Adequate Food Implementation, Accountability and Coherence for Sustainable Access to Nutritious Food and Effective Governance on Food Security and Nutrition

Textes saisis


CatégorieTexte
Mots-clé
(Allemand)
Right to adequate food Human rights system Policy coherence
Mots-clé
(Anglais)
Right to adequate food Human rights system Policy coherence
Mots-clé
(Français)
Right to adequate food Human rights system Policy coherence
Mots-clé
(Italien)
Right to adequate food Human rights system Policy coherence
Description succincte
(Allemand)
Designed for an implementation period of up to six years over the entire project cycle, the project is close to mid-term in 2017. This evaluation is sought to account for the achieved results so far and to contribute to strategic steering for the remaining period of the first phase. It will also set the base for the second administrative phase of three years (2018 – 2020).
Documents annexés
Description succincte
(Anglais)
Designed for an implementation period of up to six years over the entire project cycle, the project is close to mid-term in 2017. This evaluation is sought to account for the achieved results so far and to contribute to strategic steering for the remaining period of the first phase. It will also set the base for the second administrative phase of three years (2018 – 2020).
Documents annexés
Description succincte
(Français)
Designed for an implementation period of up to six years over the entire project cycle, the project is close to mid-term in 2017. This evaluation is sought to account for the achieved results so far and to contribute to strategic steering for the remaining period of the first phase. It will also set the base for the second administrative phase of three years (2018 – 2020).
Documents annexés
Description succincte
(Italien)
Designed for an implementation period of up to six years over the entire project cycle, the project is close to mid-term in 2017. This evaluation is sought to account for the achieved results so far and to contribute to strategic steering for the remaining period of the first phase. It will also set the base for the second administrative phase of three years (2018 – 2020).
Documents annexés
Mandataire
(Anglais)
José Parra, Andrea Ferrante
Budget imputé
(Anglais)
SDC
Bases légales
(Anglais)
Art. 57 Abs. 1 RVOG Art. 57 al. 1 LOGA Art. 57 cpv. 1 LOGA
Droits d'auteur
(Anglais)
Copyright, Bundesbehörden der Schweizerischen Eidgenossenschaft | Droits d'auteur: autorités de la Confédération suisse | Diritti d'autore: autorità della Confederazione Svizzera | Dretgs d'autur: autoritads da la Confederaziun svizra | Copyright, Swiss federal authorities
Renseignements
(Anglais)
GPFS / GZ