ServicenavigationHauptnavigationTrailKarteikarten


Forschungsstelle
EDA
Projektnummer
ExSt.2017.853
Projekttitel
Strengthening Right to Adequate Food Implementation, Accountability and Coherence for Sustainable Access to Nutritious Food and Effective Governance on Food Security and Nutrition

Erfasste Texte


KategorieText
Schlüsselwörter
(Deutsch)
Right to adequate food Human rights system Policy coherence
Schlüsselwörter
(Englisch)
Right to adequate food Human rights system Policy coherence
Schlüsselwörter
(Französisch)
Right to adequate food Human rights system Policy coherence
Schlüsselwörter
(Italienisch)
Right to adequate food Human rights system Policy coherence
Kurzbeschreibung
(Deutsch)
Designed for an implementation period of up to six years over the entire project cycle, the project is close to mid-term in 2017. This evaluation is sought to account for the achieved results so far and to contribute to strategic steering for the remaining period of the first phase. It will also set the base for the second administrative phase of three years (2018 – 2020).
Zugehörige Dokumente
Kurzbeschreibung
(Englisch)
Designed for an implementation period of up to six years over the entire project cycle, the project is close to mid-term in 2017. This evaluation is sought to account for the achieved results so far and to contribute to strategic steering for the remaining period of the first phase. It will also set the base for the second administrative phase of three years (2018 – 2020).
Zugehörige Dokumente
Kurzbeschreibung
(Französisch)
Designed for an implementation period of up to six years over the entire project cycle, the project is close to mid-term in 2017. This evaluation is sought to account for the achieved results so far and to contribute to strategic steering for the remaining period of the first phase. It will also set the base for the second administrative phase of three years (2018 – 2020).
Zugehörige Dokumente
Kurzbeschreibung
(Italienisch)
Designed for an implementation period of up to six years over the entire project cycle, the project is close to mid-term in 2017. This evaluation is sought to account for the achieved results so far and to contribute to strategic steering for the remaining period of the first phase. It will also set the base for the second administrative phase of three years (2018 – 2020).
Zugehörige Dokumente
Auftragnehmer
(Englisch)
José Parra, Andrea Ferrante
Belastetes Budget
(Englisch)
SDC
Gesetzliche Grundlage
(Englisch)
Art. 57 Abs. 1 RVOG Art. 57 al. 1 LOGA Art. 57 cpv. 1 LOGA
Impressum
(Englisch)
Copyright, Bundesbehörden der Schweizerischen Eidgenossenschaft | Droits d'auteur: autorités de la Confédération suisse | Diritti d'autore: autorità della Confederazione Svizzera | Dretgs d'autur: autoritads da la Confederaziun svizra | Copyright, Swiss federal authorities
Auskunft
(Englisch)
GPFS / GZ