ServicenavigationHauptnavigationTrailKarteikarten


Research unit
FDFA
Project number
ExSt.2016.718
Project title
Horticulture Promotion in Kosovo Summary of Impact Study 2010 - 12

Inserted texts


CategoryText
Key words
(German)
Kosovo; SDC; HPK; horticulture promotion
Key words
(English)
Kosovo; SDC; HPK; horticulture promotion
Key words
(French)
Kosovo; SDC; HPK; horticulture promotion
Key words
(Italian)
Kosovo; SDC; HPK; horticulture promotion
Short description
(German)
This report looks at highlights from the Impact Surveys over the period 2010 to 2012. Under the guidance of Ruedi Felber from ETH-Nadel in Zurich, a team of locally based staff fromHPK undertook this study over 3 periods in 2010, 2011 and 2012. Neither was a baseline survey conducted in 2001 nor were impact assessments carried out during the first 4 phases of the project. This was recognised as a gap in the project.
Related documents
Short description
(English)
This report looks at highlights from the Impact Surveys over the period 2010 to 2012. Under the guidance of Ruedi Felber from ETH-Nadel in Zurich, a team of locally based staff fromHPK undertook this study over 3 periods in 2010, 2011 and 2012. Neither was a baseline survey conducted in 2001 nor were impact assessments carried out during the first 4 phases of the project. This was recognised as a gap in the project.
Related documents
Short description
(French)
This report looks at highlights from the Impact Surveys over the period 2010 to 2012. Under the guidance of Ruedi Felber from ETH-Nadel in Zurich, a team of locally based staff fromHPK undertook this study over 3 periods in 2010, 2011 and 2012. Neither was a baseline survey conducted in 2001 nor were impact assessments carried out during the first 4 phases of the project. This was recognised as a gap in the project.
Related documents
Short description
(Italian)
This report looks at highlights from the Impact Surveys over the period 2010 to 2012. Under the guidance of Ruedi Felber from ETH-Nadel in Zurich, a team of locally based staff fromHPK undertook this study over 3 periods in 2010, 2011 and 2012. Neither was a baseline survey conducted in 2001 nor were impact assessments carried out during the first 4 phases of the project. This was recognised as a gap in the project.
Related documents
Contractor
(English)
Hans Rudolf Felber, Edvin Kotherja, Stuart Pettigrew, Hamit Qeriqi
Charged budget
(English)
SDC
Legal basis
(English)
Art. 57 Abs. 1 RVOG Art. 57 al. 1 LOGA Art. 57 cpv. 1 LOGA
Copyright
(English)
Copyright, Bundesbehörden der Schweizerischen Eidgenossenschaft | Droits d'auteur: autorités de la Confédération suisse | Diritti d'autore: autorità della Confederazione Svizzera | Dretgs d'autur: autoritads da la Confederaziun svizra | Copyright, Swiss federal authorities
Information
(English)
SDC Western Balkans Division +41 (0)58 462 12 50 azo@eda.admin.ch