ServicenavigationHauptnavigationTrailKarteikarten


Research unit
FDFA
Project number
ExSt.2015.556
Project title
External Review of Trail Bridge Sector Wide Approach Framework I

Inserted texts


CategoryText
Key words
(German)
Trail bridges, rural transport, sector wide approach, rural accessibility, disadvantaged groups
Key words
(English)
Trail bridges, rural transport, sector wide approach, rural accessibility, disadvantaged groups
Key words
(French)
Trail bridges, rural transport, sector wide approach, rural accessibility, disadvantaged groups
Key words
(Italian)
Trail bridges, rural transport, sector wide approach, rural accessibility, disadvantaged groups
Short description
(German)
The external review report clearly reflects and confirms the results achieved of TB SWAp Framework I, including that of the technical assistance provided by Switzerland in implementing TB SWAp through TBSSP III during the last 4 years. The review reports a significant improvement in access for a large number of the rural population through trail bridges, especially those in remote areas who are marginalised
Related documents
Short description
(English)
The external review report clearly reflects and confirms the results achieved of TB SWAp Framework I, including that of the technical assistance provided by Switzerland in implementing TB SWAp through TBSSP III during the last 4 years. The review reports a significant improvement in access for a large number of the rural population through trail bridges, especially those in remote areas who are marginalised
Related documents
Short description
(French)
The external review report clearly reflects and confirms the results achieved of TB SWAp Framework I, including that of the technical assistance provided by Switzerland in implementing TB SWAp through TBSSP III during the last 4 years. The review reports a significant improvement in access for a large number of the rural population through trail bridges, especially those in remote areas who are marginalised
Related documents
Short description
(Italian)
The external review report clearly reflects and confirms the results achieved of TB SWAp Framework I, including that of the technical assistance provided by Switzerland in implementing TB SWAp through TBSSP III during the last 4 years. The review reports a significant improvement in access for a large number of the rural population through trail bridges, especially those in remote areas who are marginalised
Related documents
Contractor
(English)
Kapil Ghimire, Ansu Tumbahangfe, Buddhiman Shrestha. Independant Consultants mandated by Swiss Embassy Nepal
Charged budget
(English)
DDC / DEZA / SDC / DSC / COSUDE
Legal basis
(English)
Artikel 170 der Bundesverfassung zur WirksamkeitsüberprüfungArticle 170 de la Constitution fédérale relatif à l’évaluation de l’efficacitéArticolo 170 della Costituzione federale sulla verifica dell‘efficaciaArticle 170 of the Swiss Federal Constitution on the evaluation of effectiveness
Copyright
(English)
Copyright, Bundesbehörden der Schweizerischen Eidgenossenschaft | Droits d'auteur: autorités de la Confédération suisse | Diritti d'autore: autorità della Confederazione Svizzera | Dretgs d'autur: autoritads da la Confederaziun svizra | Copyright, Swiss federal authorities
Information
(English)
South Asia Division, Bern