ServicenavigationHauptnavigationTrailKarteikarten


Forschungsstelle
EDA
Projektnummer
ExSt.2013.305
Projekttitel
External Review on \"Restoration of Golema River Project, Phase 1 and Phase 2\"

Erfasste Texte


KategorieText
Schlüsselwörter
(Deutsch)
Macedonia, environment, river restoration, water quality, pollution, solid and pesticide waste issues, sewage, waste and wastewater management, awareness raising
Schlüsselwörter
(Englisch)
Macedonia, environment, river restoration, water quality, pollution, solid and pesticide waste issues, sewage, waste and wastewater management, awareness raising
Schlüsselwörter
(Französisch)
Macedonia, environment, river restoration, water quality, pollution, solid and pesticide waste issues, sewage, waste and wastewater management, awareness raising
Schlüsselwörter
(Italienisch)
Macedonia, environment, river restoration, water quality, pollution, solid and pesticide waste issues, sewage, waste and wastewater management, awareness raising
Kurzbeschreibung
(Deutsch)
Comprehensive analysis of Golema River catchment has been made, identifying major environmental problems, as well as suggesting solutions. Most effective of the proposed measures have been selected and implemented. Besides restoration/rehabilitation of parts of the river corridor in the urban and rural areas, issues of solid and pesticide waste, as well as sewage and rainwater discharges have been tackled. In the course of the project implementation, due attention has been paid to strengthening of the capacity of Resen Municipality, CSOs and NGOs, and to public awareness raising. Ecosystem oriented river restoration measures have been demonstrated. As a result, part of the river has been rehabilitated, pollution reduced, overall capacity and awareness in the region improved. Project interventions are visible regarding the riverbed and wastewater and waste management. Improvement of water quality in Golema Reka and eventually, Lake Prespa, cannot be quantified due to lack of comparable „before and after? monitoring data.Overall, it can be concluded that the Restoration of Golema River Project Phase I and II have achieved the planned objective, and contributed to improvement of Golema River corridor and the environment.
Zugehörige Dokumente
Kurzbeschreibung
(Englisch)
Comprehensive analysis of Golema River catchment has been made, identifying major environmental problems, as well as suggesting solutions. Most effective of the proposed measures have been selected and implemented. Besides restoration/rehabilitation of parts of the river corridor in the urban and rural areas, issues of solid and pesticide waste, as well as sewage and rainwater discharges have been tackled. In the course of the project implementation, due attention has been paid to strengthening of the capacity of Resen Municipality, CSOs and NGOs, and to public awareness raising. Ecosystem oriented river restoration measures have been demonstrated. As a result, part of the river has been rehabilitated, pollution reduced, overall capacity and awareness in the region improved. Project interventions are visible regarding the riverbed and wastewater and waste management. Improvement of water quality in Golema Reka and eventually, Lake Prespa, cannot be quantified due to lack of comparable „before and after? monitoring data.Overall, it can be concluded that the Restoration of Golema River Project Phase I and II have achieved the planned objective, and contributed to improvement of Golema River corridor and the environment.
Zugehörige Dokumente
Kurzbeschreibung
(Französisch)
Comprehensive analysis of Golema River catchment has been made, identifying major environmental problems, as well as suggesting solutions. Most effective of the proposed measures have been selected and implemented. Besides restoration/rehabilitation of parts of the river corridor in the urban and rural areas, issues of solid and pesticide waste, as well as sewage and rainwater discharges have been tackled. In the course of the project implementation, due attention has been paid to strengthening of the capacity of Resen Municipality, CSOs and NGOs, and to public awareness raising. Ecosystem oriented river restoration measures have been demonstrated. As a result, part of the river has been rehabilitated, pollution reduced, overall capacity and awareness in the region improved. Project interventions are visible regarding the riverbed and wastewater and waste management. Improvement of water quality in Golema Reka and eventually, Lake Prespa, cannot be quantified due to lack of comparable „before and after? monitoring data.Overall, it can be concluded that the Restoration of Golema River Project Phase I and II have achieved the planned objective, and contributed to improvement of Golema River corridor and the environment.
Zugehörige Dokumente
Kurzbeschreibung
(Italienisch)
Comprehensive analysis of Golema River catchment has been made, identifying major environmental problems, as well as suggesting solutions. Most effective of the proposed measures have been selected and implemented. Besides restoration/rehabilitation of parts of the river corridor in the urban and rural areas, issues of solid and pesticide waste, as well as sewage and rainwater discharges have been tackled. In the course of the project implementation, due attention has been paid to strengthening of the capacity of Resen Municipality, CSOs and NGOs, and to public awareness raising. Ecosystem oriented river restoration measures have been demonstrated. As a result, part of the river has been rehabilitated, pollution reduced, overall capacity and awareness in the region improved. Project interventions are visible regarding the riverbed and wastewater and waste management. Improvement of water quality in Golema Reka and eventually, Lake Prespa, cannot be quantified due to lack of comparable „before and after? monitoring data.Overall, it can be concluded that the Restoration of Golema River Project Phase I and II have achieved the planned objective, and contributed to improvement of Golema River corridor and the environment.
Zugehörige Dokumente
Auftragnehmer
(Englisch)
Vladimir Stavri?
Belastetes Budget
(Englisch)
SDC / DEZA / DDC / DSC / COSUDE
Gesetzliche Grundlage
(Englisch)
Art. 57 Abs. 1 RVOG Art. 57 al. 1 LOGA Art. 57 cpv. 1 LOGAArtikel 170 der Bundesverfassung zur WirksamkeitsüberprüfungArticle 170 de la Constitution fédérale relatif à l’évaluation de l’efficacitéArticolo 170 della Costituzione federale sulla verifica dell‘efficaciaArticle 170 of the Swiss Federal Constitution on the evaluation of effectiveness
Impressum
(Englisch)
Copyright, Bundesbehörden der Schweizerischen Eidgenossenschaft | Droits d'auteur: autorités de la Confédération suisse | Diritti d'autore: autorità della Confederazione Svizzera | Dretgs d'autur: autoritads da la Confederaziun svizra | Copyright, Swiss federal authorities
Auskunft
(Englisch)
Swiss Cooperation Office in Macedonia