ServicenavigationHauptnavigationTrailKarteikarten


Research unit
INNOSUISSE
Project number
25193.1 PFEN-IW
Project title
Optimization of a high performance battery production line

Texts for this project

 GermanFrenchItalianEnglish
Short description
Anzeigen
-
-
Anzeigen
Abstract
Anzeigen
-
-
Anzeigen

Inserted texts


CategoryText
Short description
(German)
Ganzheitliche Auslegung einer Hochleistungsproduktionslinie für Batterien
Short description
(English)
Optimization of a high performance battery production line
Abstract
(German)
This project will generate the knowledge to enable the fundamental upscale of the existing laboratory production with semi-automated, stand-alone processes via a pilot line into a fully automated mass productionline. The concept of #Industrie 4.0# will be used to improve productivity and to get a flexible production at the cost level of mass production. A holistic approach will combine process and machine level with matters of quality.
Abstract
(English)