project 5: additional costs caused by bringing forward or delaying rehabilitation procedures

Texts for this project

 GermanFrenchItalianEnglish
Key words
Anzeigen
-
-
Anzeigen
Short description
Anzeigen
-
-
Anzeigen
Project description
Anzeigen
-
-
-
Methods
Anzeigen
-
-
-
Special tools and infrastructure
Anzeigen
-
-
-
Overview of own research activities
Anzeigen
-
-
-
Project aims
Anzeigen
-
-
Anzeigen
Research agenda
Anzeigen
-
-
-
Transfer and application
Anzeigen
-
-
-
Publications / Results
Anzeigen
-
-
-
Berichtsnummer
Anzeigen
-
-
-
Literature
Anzeigen
-
-
-

Inserted texts


CategoryText
Key words
(German)
Strassenerhaltungsmanagement, Zusatz-Kosten-Nutzen-Verhältnis, Verschieben von Erhaltungsmassnahmen, Erhaltungsstrategien, Simulationsrechnung
Key words
(English)
road rehabilitation management, additional-cost-benefit-ratio, procedures of rehabilitation, strategies of rehabilitation, simulation model
Short description
(German)
Aufbauend auf den Input-Ergebnissen der Vorgängerprojekte (VSS 2004/711-714) wird ein Zusatz-Nutzen-Kosten-Modell entwickelt, das die Auswirkungen auf die Kosten und den Nutzen bei Verschiebung von standardisierten Erhaltungsmassnahmen bewertet. Mit einem Simulationskonzept können die verschiedenen Varianten der Massnahmenverschiebungen untersucht bzw. simuliert werden. Diese werden mit den Kosten und dem Nutzen der „Standardinstandsetzung“ verglichen, was folgende Ergebnisse erzeugt:
- Bestimmung des Kosten-Nutzen-Break-Even-Points der Massnahmenvarianten in zeitlicher Hinsicht
- Direktkostenerhöhungen und Substanzwertverlust beim Betreiber
- volkswirtschaftliche Gesamtkosten und –nutzenerhöhung bzw. -nutzenverlust
Zudem werden nicht nur die „Totalkosten und Nutzen“ dargestellt, sondern auch der Zeitwert der Massnahmen. Dadurch erhält man einen realen Vergleich der Kosten und des Nutzens, die bei den verschiedenen Varianten zu unterschiedlichen Zeitpunkten auftreten.
Short description
(English)
Based on input results of preceding projects (VSS 2004/711-714), an model for additional-cost-benefit is developed, evaluating the effects on costs and benefit in consequence of the adjustment of standardized rehabilitation procedures.
The different variances of procedure shifts can be analyzed (and simulated) with a simulation concept and compared with the costs and benefits of the “standard-rehabilitation”, which causes following results:
- ascertainment of the cost-benefit-break-even-points of procedure variances under time aspects
- increase of direct costs and loss of actual value for the operator
- increase of national economical total costs and benefits and losses of actual value
Additionally, not only “total costs and benefits” are described but also the time value of the procedures. Thereby a real comparison of costs and benefits occurring in different variances at different times is developed.
Project description
(German)
siehe Projektbeschreibung
Methods
(German)
Siehe Projektbeschreibung
Special tools and infrastructure
(German)
Keine
Overview of own research activities
(German)
Forschungsprojekt VSS 2003/007 "Kommunale Strassennetze ind der Schweiz: Formen neuer PPP-Kooperationen für den Unterhalt"; Forschungsprojekt "Risikobasierter Vergleich der Lebenszykluskosten unterschiedlicher Projektausführungsvarianten"
Project aims
(German)
Ermittlung der Veränderungen der Gesamtkosten und Gesamtnutzen von Erhaltungsmassnahmen der Fahrbahnen im Zusammenhang mit zeitlichen Verschiebungen der Ausführung der Erhaltungsmassnahmen; Normenentwurf
Project aims
(English)
effects on shifts of total costs and total benefit of rehabilitation procedures of roadways in connection with time adjustments of the execution of rehabilitation procedures; norm concept
Research agenda
(German)
Arbeitspaket (AP) / Ressourcen (Aufwand) / Zeitbedarf
AP1 - Inputparameter / 17 Tage / 2 Monate
AP2 - Lebenszyklusorientiertes Verschiebungskonzept / 44 Tage / 5 Monate
AP3 - Simulationsmodell / 62 Tage / 5 Monate
AP4 - VSS-Arbeitspapier / 22 Tage / 2 Monate
Transfer and application
(German)
Das Zusatz-Kosten-Nutzen-Modell soll den fachlichen sowie politisch zuständigen Entscheidungsträgern die Auswirkungen ihres Handelns in den Dimensionen
- Direktkosten der Entscheidung (Objektträger)
- Softkosten der Entscheidung (Nutzer) sowie der Dimension
- des Nutzens bzw. Verlusts in Bezug zum Substanzwert bzw. dessen Entwicklung
aufzeigen. Das Zusatz-Kosten-Nutzen-Modell wird dabei eine Lebenszyklus-Kosten-Nutzen-Entwicklung simulieren.
Publications / Results
(German)
.
Berichtsnummer
(German)
1282
Literature
(German)
Siehe Projektbeschreibung