En-tête de navigationNavigation principaleSuiviFiche


Unité de recherche
COST
Numéro de projet
C00.0050
Titre du projet
Contribution suisse à l'état des connaissances relatives aux techniques et aux procédures de maintenance

Textes relatifs à ce projet

 AllemandFrançaisItalienAnglais
Mots-clé
-
-
-
Anzeigen
Programme de recherche
-
-
-
Anzeigen
Description succincte
-
-
-
Anzeigen
Autres indications
-
-
-
Anzeigen
Partenaires et organisations internationales
-
-
-
Anzeigen
Résumé des résultats (Abstract)
-
-
-
Anzeigen
Références bases de données
-
-
-
Anzeigen

Textes saisis


CatégorieTexte
Mots-clé
(Anglais)
Road; pavement; maintenance; traffic; management
Programme de recherche
(Anglais)
COST-Action 343 - Reduction in Road Closures by Improved Maintenance Procedures
Description succincte
(Anglais)
See abstract
Autres indications
(Anglais)
Full name of research-institution/enterprise: EPF Lausanne Département de génie civil LAVOC Laboratoire des voies de circulation
Partenaires et organisations internationales
(Anglais)
A, B, HR, CZ, DK, FIN, F, D, GR, H, IRL, I, NL, N, PL, P, RO, SI, E, S, CH, GB
Résumé des résultats (Abstract)
(Anglais)
The COST Action 343 'Reduction in Road Closure by Improved Maintenance Procedures' started in April 1999. The primary objective of the Action is to achieve a reduction in the number and duration of road closures by finding an appropriate balance between engineering-focused pavement maintenance and user costs, delays, and safety hazards. The objective will be attained by identifying the most appropriate pavement maintenance options using best procedures for the organisation and selection of the maintenance treatments. The Work Programme of the Action is built around five Work Packages, each producing one of the five deliverables. The Swiss contribution deals with the Work Packages 1 and 2. The aim of Work Package 1 is to produce a database of maintenance options that are applied across Europe, including data on their life expectancy and on the time required for their application. Work Package 2 aims at producing a document containing a selection of maintenance procedures and schemes regarding the organisation of pavement maintenance on motorways and primary road networks in Europe, which seem to be the most interesting and the most promising regarding the reduction of road closure, traffic disruption, and safety issues. As such information is not centralised in Switzerland, but spread in the different cantons and although in the road construction companies, it has been decided to collect requested information in some cantons in the French part as well as in the German speaking part, in order to have a good representation of the maintenance techniques and procedures that are applied in Switzerland. Information on maintenance techniques and procedures have been collected in the cantons of Fribourg, Vaud, Valais, Zürich, Graubünden und St Gallen by interviewing road maintenance managers in charge of the maintenance of the motorways and the primary road network. Information has also been provided by Mr. Rafi, expert in pavement maintenance.
Références bases de données
(Anglais)
Swiss Database: COST-DB of the State Secretariat for Education and Research Hallwylstrasse 4 CH-3003 Berne, Switzerland Tel. +41 31 322 74 82 Swiss Project-Number: C00.0050