ServicenavigationHauptnavigationTrailKarteikarten


Research unit
INNOSUISSE
Project number
37268.1 INNO-ENG
Project title
Assessment of the performance of fault locating methods based on the electromagnetic time reversal theory for typical electrical power grids
Project status Finished
 
Start date 28.05.2019
End date 28.05.2021
 
Granted total costs 15'000.00  CHF
Section 70 Engineering
Project category Project
Research type Applied research and development
NABS classification Industrial production and technology
 
Research disciplines
100 % T190 Electrical engineering

Last modification of the project